Monday, February 11, 2013

Door Trim Installed

This weekend Brent worked on the door trim for the two (2) bedroom doors downstairs.  He purchased two (2) 8 foot long 1"x 12" and fabricated the trim.  We decided on a craftsman style and hopefully we will get the based boards installed next weekend.  This is all dependent upon when Jillian decides to arrive as we are now in def con 5 and awaiting news from Evansville.  Once the labor begins, we drop everything and head north.

Need to install one (1) more coat to cover the nail holes.  Brent finished installing just before we left and the wood filler was not dry.

It will look a lot better once the crown molding and baseboards are installed.

The snow line is receding on Mt. LeConte.  The earliest estimate for the reopening of the US 441 to Cherokee is May 2013.

1 comment:

  1. It is so good to see how this transformation
    of the chalet is taking place.
    GOOD JOB!!!!!!!!!!

    ReplyDelete