Monday, February 6, 2012

More Drywall

It was a beautiful drive over the mountains into Gatlinburg on Friday.  The views through the Smoky Mountains were very spectacular.  The girls made it over Friday night from UT, so we talked and watched movies.  Brent did perform a little demo work on Friday as he removed the sheet rock from the ceiling in the old closet over the stairway.

On Saturday, the scaffolding was removed and lowered about one (1) foot to allow the next row of sheet rock to be installed.  Afterwards, we all took a lunch break and went into Gatlinburg to Partin's Delicatessen for sandwiches.  They make one of the best reuben sandwiches and have a fantastic home made potato salad.

After a little more prep work, the drywall was installed over the stairway.  Also, more of the paneling was removed on the face wall.  No mudding was performed this week as Brent was not feeling the greatest and need to take a mid-day nap to get his strength back.  We do expect to gather more supplies during the week and head back next weekend to start mudding over the stairway and finish installing the sheet rock on the face wall.

On the drive back over Newfound Gap on Sunday, the Tennessee side of the National Park truly lived up to the name Smoky.  After we reached Newfound Gap and crossed into North Carolina, it was clear and with lots of sunshine.  We again had a wonderful time over the weekend with the girls and a safe trip back.

The sheet rock was removed for the former ceiling of the closet  which was over the stairs.

The paneling which is still located on the face wall.

The scaffolding was lowered to allow the next course of sheet rock to be installed in the stairwell.

The scaffolding will remain so we can tape and mud the joints.

The paneling is removed from the face wall with only a few minor injuries.

The ladders are moved into position to install a full sheet of  drywall on the face wall.

After lifting into place, Brent is screwing in the sheet rock.

I guess the missing pieces will have to be installed next weekend.

It is getting closer.

A few of the two (2) pieces of sheet rock installed over the stair well .

The lower ceiling was the inside of a hall closet.

The famous scaffolding.

A view of the Chimney Tops on our drive back on Sunday.

The view is beautiful from down here but I bet the hikers up top  have an obstructed view.

Friday, February 3, 2012

It's Friday, so it must be time to drive.

It's Friday and we are just about ready to head over Newfound Gap to Blackbearry Ridge.  There are a couple of thrift stores that we plan on stopping by in North Carolina.  Looks like more sheet rock installation and the beginning of the mudding are on the agenda.  Not sure if the girls will be able to make it for the weekend.  Will post pictures of our progress later.    

Sunday, January 29, 2012

A Goal Set and Met

Despite a late start, we did make it across Newfound Gap with no problems and arrived at Blackbearry Ridge at 4:30 pm.  Almost immediately, the truck was fired up and off to Home Depot we headed for lumber.  Our goal this weekend was to install top portion of drywall over the stairs, which is in an awkward location.  To accomplish this, we needed to build a sturdy scaffold over the stairwell that would still allow us to use the stairs.

Saturday morning was productive and the scaffold was built.  Then prior to lunch we headed back to Home Depot for some additional supplies.  Then we had a few challenges that required taking down the the existing molding and also removing the ceiling beam.  All of this just to be able to remove the paneling.  As in all our remodeling projects, the surprises take a few extra hours but we are always victorious.  The last piece of drywall was installed around 7:30 pm.  It was later than expected, but we had reached our goal.

Now in the near future comes the taping, mudding and sanding.  Oh brother!

The challenge of removing the paneling and then installing drywall.

The stairwell that need to been spanned by the scaffolding.
A view of the completed scaffolding from the kitchen area.
The span over the stairwell still allows us to use the stairs.

Cookie inspects the scaffolding.

All the paneling, molding and the beam are removed.  This was required because the paneling was installed first, then molding and finally the beam.

The first sheet of drywall is installed.

Mission accomplished.  A very long but satisfying day.

There were moments of looking at Mt. LeConte and the snow at the peaks.  It arrived on Saturday but was gone on  Sunday.  We had clear passage coming and going across Newfound Gap this weekend.
Cookie loves standing on Brent's shoulder and sticking her head out of the sunroof as we drive through the Smoky Mountain National Park.

Thursday, January 26, 2012

Having to make-up for a missed weekend

We missed heading over to Blackbearry Ridge last weekend due to another commitment.   Unless the paying "work" requires Brent to stay here this weekend, we will head over Friday afternoon with the goal of installing sheetrock over the stairway.  We will need to build a scaffold to reach over the stairway and to the peak of the way and still allow us to use the stairs.  Hope we don't forget to bring the sheetrock up the stairs first.

Pics to follow after this weekend.

Monday, January 16, 2012

Stepping Up

As we started our journey over to Blackbearry Ridge, Highway 441 across Newfound Gap was not open.  During our ride over, JoLynn received a tweet that the road was open, so we made a bee line to Cherokee.  There was very little traffic on the road and once we got into the higher elevation, the roads were a little icy.  We made it through fine and about an hour after we got to the house, the park service closed the road.

The girls made over from UT after dark and were spending the weekend with us in Gatlinburg.  After a trip to Home Depot on Saturday morning, work continued on the stairs.  We did have to cut the work period down because we went to the "Hatfield and McCoys" dinner show in Pigeon Forge on Saturday night.  We had a great time and glad we got the local discount.

We headed back early on Sunday, because we swung by Zelda in Kings Mountain, NC.  Because of the cold weather, Brent wanted to shut off the water and drain the lines at the house even though the heat is on at the house.  With all the thefts of ac units for the copper content, Brent did not want to have someone steal our units and then have to deal with water damage inside the house.

The work done on the stairs for this weekend did include finishing the bottom landing post and preparing the bottom for sheet rock.  There were a lot of areas that did not have sections of wood to screw in the sheet rock and we had to adjust the depth of electrical receptacles for the sheet rock in stead of the paneling.

Just pass the turnout to Clingmans' Dome and prior to Newfound Gap.

The entrance to the tunnel past Newfound Gap.

Entrance to the tunnel just past the Chimney Tops trail head.

The Chimney Tops

JoLynn, Jennifer and Jessica at the Hatfield and McCoy dinner show.