Ready for Renovation in 2013

Work continues in 2013 at The Ridge.  The sheet rock was installed, mud and sanded before we took a break during the Holidays.  The primer will be applied to the ceiling and walls on Friday night and the first of two (2) coats of paint applied on Saturday.

The final pieces of sheet rock being installed.
The final application of mud was installed and the sanding is complete.
Now that the corner at the bottom of the stairs has been completed, the green color will flow into the hall.